Developing the design and engineering is the first step to building your vision. Our designer works with you throughout the process to realize it
WOB handles all the permitting so that you don't have to go to the city offices and wait in line! We have already built relationships there
The fun part begins. Visit our showroom and choose finishing products or we can source them from wherever you want
Now that planning is approved it is time for excavation and foundation. From there, our guys finish the entire build
After many inspections and product choices, the ADU is finished and it is time to put it to use. Congratulations!
Our clients love their new ADU's and use them in all sorts of ways. Time to get the word out
Envisioned was a two story ADU with a two car garage on the bottom and detached 800 ft2 unit on top
We work closely with the City of Portland (and surrounding areas) and the process was smooth
After about 10 months of design and permitting construction started in October of 2019
There are a ton of inspections throughout the process. Our team handles them all
Clients can source all their finishing choices through our showroom. So many choices
The ADU was completed in September of 2020. 11 months of hard work, fine tuning and close attention to detail. Please read the review left by Eddie on our Reviews page